Skip to content
Hysi Framing Inc., Calgary framing contractor
Residential Framing · Calgary

House framing in Calgary, built to last.

New homes, custom builds, additions, and renovations. We frame the houses Calgary families actually live in: square, code-compliant, and ready for the next trade on day one.

Overview

Residential Framing, done the Hysi way.

Hysi Framing is a Calgary residential framing contractor working on single-family homes, infill builds, second-storey additions, and major renovations. Our framers know Alberta Building Code inside out, and we work daily with the engineers, designers, and inspectors who run Calgary residential construction.

We frame for homeowners going direct, for custom-home builders, and for general contractors. Whether your project is a 1,200 sq ft starter on a tight inner-city lot or a 6,000 sq ft custom in Aspen Woods, the same crew, the same standards, the same schedule discipline.

Scope

What residential framing covers

New single-family homes

Sill plates, floor systems, wall framing, roof systems, and rough openings: from foundation hand-off to lockup, ready for envelope and mechanicals.

Second-storey additions

Add a floor without losing the rest of your house. We tarp, brace, frame the new structure, and tie it cleanly into existing roof and wall lines.

Custom & luxury homes

Complex roof geometries, exposed beams, vaulted ceilings, engineered LVL drops, glulam carries. We read complicated drawings and build them clean.

Home additions & renovations

Bump-outs, rear additions, garage-to-living conversions, full gut renos. We open it up, engineer the structural moves, and rebuild stronger.

Infill homes

Calgary inner-city builds where every inch matters. We work tight lots, shared property lines, and the parking nightmares that come with them.

Multi-family & duplexes

Side-by-sides, four-plexes, and town-home framing, with fire-rated demising walls done correctly the first time.

Process

How we frame your Calgary home

  1. 01

    Plans review & quote

    Send us your drawings. We review structure, scope, and access, then come back with an itemized framing quote, usually within 2 to 4 business days.

  2. 02

    Scheduling & material

    Once awarded, we slot you into the schedule, coordinate with your GC or supplier on lumber package and trusses, and lock down a start date you can plan around.

  3. 03

    Framing on site

    Floor systems, wall framing, roof system, sheathing. Our lead carpenter is on site every day. Daily clean-up is part of the job, not an afterthought.

  4. 04

    Inspection & hand-off

    We meet the City of Calgary framing inspector with you, address anything noted, and hand off cleanly to your envelope and rough-in trades.

FAQ

Questions Calgary owners ask us.

Not finding what you need? Send us your plans or give us a call, happy to walk you through it.

Send us your plans
How much does it cost to frame a house in Calgary?
Residential framing in Calgary is typically quoted per square foot of framed area, then adjusted for complexity: roof pitch, ceiling height, wall openings, beam work, and access. We always quote off the actual plans so the number is real, not a guess.
How long does it take to frame a Calgary home?
A standard 2,000 sq ft single-family home in Calgary typically frames in 3 to 5 weeks from sill plate to lockup, weather depending. Custom homes with complex roofs or two storeys may run 6 to 8 weeks. We give you an honest schedule before we start.
Do you frame in winter?
Yes. Calgary winters are part of the job. We frame through chinooks, cold snaps, and shoulder seasons. We adjust schedule for weather where it makes sense, but we are not a fair-weather crew.
Can you handle the trusses and floor system order?
We coordinate directly with your truss and joist supplier on layouts and delivery, and we install both. If you do not have a supplier yet, we can recommend the ones we trust in Calgary.
Let's Build

Ready to break ground in Calgary?

Send us your plans for a free, no-obligation framing quote. Most quotes back within 48 hours.